Oropol Industrial Unit / Em Paralelo

![]()
![]()
![]()
![]()

- Space:
27986 ft²
12 months:
2023
-
Lead Architects:
Cristina Vaz Santos and Paulo Rodrigues

Textual content description offered by the architects. The constructing is characterised by 2 flooring and a technical basement, all of which have completely different traits.
The prevailing basement flooring: devoted completely to manufacturing help tools that won’t bear any modifications.


The present floor flooring: internally has an entrance space with a corridor, reception space and respective assist areas: assembly room and sanitary amenities for purchasers.

The remaining space is organized as follows: raise room, stairwell with direct entry to the surface, work space, flooring -1 and entry to the second flooring.

Adjoining to the vertical communications, female and male sanitary amenities to assist the work area.




Lastly, on the again there’s a technical space the place the technical tools was positioned.
Due to this fact, by a coated and closed passage to the east, the identical flooring will likely be expanded, with a indifferent location from the present constructing by round 8 meters, permitting for outside leisure areas and above all architecturally differentiating each buildings with distinct photos.

This flooring can even be devoted to work with the inclusion of CNC machines, a rise within the space devoted to sanitary amenities will likely be included to cowl new staff, assist workplaces, vertical communications surrounding a brand new freight elevator that can serve this flooring and the brand new flooring to design that can talk equally with the prevailing one. On the rear of this enlargement there will likely be an space devoted to the technical space.

On the present flooring, all areas will likely be maintained, specifically, sanitary amenities, assembly room, social amenities, work space the place there are sprucing and components washing machines.

Via this flooring, as talked about above, there’s a passage to the brand new enlargement by a coated and closed walkway, which is able to give entry to the brand new constructing, an area devoted completely to work (sprucing machines and washing machines), this flooring is promoted with communications vertical to the decrease flooring by an inside staircase and freight elevator, sanitary amenities to assist staff and at last, situated behind the constructing there will likely be an exterior metallic staircase, to adjust to fireplace security laws as a type of evacuation in case of emergency.

With the picture of the brand new constructing, the intention is to create a bolder and extra distinct architectural strategy between each buildings, but pleasant.

This resolution, with a extra audacious character, with thermal considerations, taking aesthetic benefit of the blades that typically create moments of shadow and typically create moments of extra tenuous and managed gentle.
As within the current constructing, the predominance of wooden is a related level and affirms the constructing’s picture, therefore the veneers of the brand new constructing search a sure symbiosis with the present one, with the lacquering of the veneers alluding to wooden.
It’s a extra impartial constructing, particularly on the inside, by which wooden not exists and the construction materializes in a concrete construction painted in white.
A nível de arranjos exteriores houve necessidade de uma reformulação completa, quer a nível de estacionamento, quer a nível de aproveitamento de todo o espaço possível no quadrante norte e nascente. Será construindo em toda a parte posterior do terreno um muro em gabião em forma de socalco mantendo-se parcialmente um talude como zona verde e por fim manter na “crista” do terreno a vedação metálica existente como término dos limites junto ao caminho de servidão às propriedades adjacentes.